Nitrogen rules · ItalyIT-65

When can you spread nitrogen in Abruzzo?

In Abruzzo's nitrate-vulnerable zones (ZVN), nitrogen fertiliser can't go on from 15 November to 15 February.

This winter2026–27
Closed
15 November – 15 February

2026–27

First day to spread
16 February

2027, on ground that isn't frozen, waterlogged or snow-covered

Durum wheat, season maximum
190 kg N/ha

Efficient nitrogen per year, all products together

Closed periodZVN
  • The regional legal maximum per crop was not checked; the national table is used.

Sources: the regional nitrates action programme (Programma d'Azione Nitrati) and DM 5046/2016. Rules checked 2 November 2026. These are the closed periods for nitrogen fertilisers (mineral N); livestock manure, slurry and digestate have their own periods, not covered here. Not legal advice: check your regional programme and bulletin before you spread.

How muchkg N/ha

At most 100 kg N/ha on arable and vegetable crops, 60 on tree crops and vines in one application; above that, split it. Here it is good practice from the national integrated-production guidelines (LGNPI 2025), copied by the regional DPI — not nitrate law. Slow-release nitrogen is usually exempt.

  • The national table (DM 5046/2016, Annex X).
  • Livestock manure counts against the maximum at 40 % of its nitrogen (solid manure, compost, solid digestate), 50 % (cattle slurry) or 60 % (pig and poultry slurry, whole digestate). Mineral fertiliser counts in full.
  • Never on frozen, snow-covered, waterlogged or flooded ground (DM 5046/2016, Art. 36).
Outside a ZVNnon-ZVN

These dates apply in nitrate-vulnerable zones. Outside a ZVN we found no winter closed period for nitrogen fertiliser in the regional rules; the regional DPI and good practice still apply.

Not sure whether your field is in a ZVN? Your region's geoportal has the map; in Aspace you set it per field.

QuestionsFAQ

When does the nitrogen closed period end in Abruzzo?

For winter 2026–27 the closed period ends on 15 February 2027: from 16 February 2027 nitrogen fertiliser can go on again in the ZVN, as long as the ground isn't frozen, waterlogged or snow-covered.

How much nitrogen can go on durum wheat in Abruzzo?

In Abruzzo's ZVN the season maximum for durum wheat is 190 kg of efficient nitrogen per hectare a year, all products together. At most 100 kg N/ha on arable and vegetable crops, 60 on tree crops and vines in one application; above that, split it. Here it is good practice from the national integrated-production guidelines (LGNPI 2025), copied by the regional DPI — not nitrate law. Slow-release nitrogen is usually exempt.

Does the closed period apply outside the ZVN?

These dates apply in nitrate-vulnerable zones. Outside a ZVN we found no winter closed period for nitrogen fertiliser in the regional rules; the regional DPI and good practice still apply.

N Balancefree field

Let the N Balance keep track.

Draw your field and the N Balance finds its region, sizes the top-dress against the season maximum and never suggests a day inside the closed period. Your first field is free, up to 10 ha.