Blog · article

Phosphorus and potassium between soil tests: a running budget

A soil test tells you the phosphorus and potassium on the day of sampling. Every harvest takes some away and every fertiliser puts some back. The P/K budget keeps the count between tests, by the Italian integrated-production method, with a range.

Most farms test phosphorus and potassium every few years. In between, the number on the last report slowly stops being true: every harvest carries some away, every load of fertiliser or manure puts some back. The P/K budget keeps the running count, so you know roughly where the soil is before the next test.

The sum

Soil test today ≈ last lab value + (what you applied − what the harvests removed) ÷ the soil's buffer.

  • The last lab value: the newest test on the field with Olsen P or exchangeable K. If several samples were taken that day, from a sampling plan, they're averaged.
  • What you applied: every fertiliser and manure record on the field since that test, converted to kg P2O5 and K2O per hectare.
  • What the harvests removed: each harvest's yield (the yield you recorded, else the expected yield, else the crop's typical yield) times what each tonne carries away. Potassium also leaves by leaching on light soils, and that is counted too.
  • The buffer: how many kilos of P2O5 or K2O it takes to move the soil test by 1 mg/kg. It follows the method of the Italian integrated-production rules (DPI): it depends on the soil's texture, its lime for phosphorus and its clay for potassium.

Why a range

Soils move more slowly than the DPI method says, and phosphorus runs down along a curve rather than a line. The starting value isn't exact either: a lab is about ± 15 % on Olsen P and ± 10 % on potassium, and one composite sample can be well off the field average. So the budget shows a range, from the DPI change down to a third of it, around a start value with its own uncertainty. It's indicative, and a lab test confirms it.

A check when you test again

When the field has two lab dates, the budget runs the same sum over the earlier interval and puts its prediction next to what the second test measured. It reads consistent when the two overlap and not consistent when they don't. That's the check to look at before trusting the projection for the years ahead.

Recording what you spread

The budget is only as good as the records. You can add them from the Fertiliser page (several fields at once), import a spreadsheet, mark a variable-rate map as applied, or send a grower a link to record what they spread, which waits for your approval. The same records feed the N Balance.

What it's for

The budget tells you whether a field is building up or drawing down, and roughly how fast. Use it to decide when a field is due for a test, which fields can skip phosphorus or potassium for a season, and which need more. The nutrient plan then sets the doses from the soil's class and the crop's needs.

Try it on your field

Draw a field, add your last soil test and your fertiliser records. Your first field is free, up to 10 hectares, with every feature. Start with a free field.

Indicative: a lab test confirms it.